Recovery times you can prove.
Procedures, durations and links add up to a calculated timeline, checked against each recovery-time objective.
A recovery time typed into a spreadsheet is a promise nobody has checked.
How it works
- 01
Add up the procedures
Durations and links become a calculated timeline.
- 02
Check the objective
The result reads Within, Exceeds or No objective defined.
- 03
Slide a duration
Watch the end time and the critical chain change.
What you get
- Within, Exceeds or No objective defined, stated plainly.
- Slide a duration and watch the end time and the critical chain change.
- An incomplete plan says so. It never claims a pass.
833 of 833
recovery start times matched the previous eBRP Suite calculation.
Verified on a 217-plan test dataset.Try the what-if slider.
Change the duration of one step and watch the end time and the critical chain move.
Within the 4 h objective by 15 min.
Demo plan with sample durations. Not customer data.